Built for Steelworkers
RAMS, CPP & Site Documents for Steelworkers
Structural steelwork involves crane lifts, working at height, and bolting connections in exposed positions. Your RAMS need to match the seriousness of the work.
No card needed · Used by UK steelworkers · CDM 2015 compliant

Built for Steelworkers
Real work, real hazards. Pick the job closest to yours to start a free job pack with the scope already filled in:
Structural steel erection
Portal frames, multi-storey steel frames, mezzanines — covers crane operations, working at height, and temporary stability during erection.
Start with this job →Steel beam installation (domestic)
RSJs for structural openings, loft conversion steels — covers manual handling of heavy beams, working in confined spaces, and temporary propping.
Start with this job →Welding and fabrication on site
Site welding, bolt tightening, connection modifications — covers hot work, fume exposure, UV radiation, and fire risk.
Start with this job →Steel decking and cladding support
Metal decking installation, cladding rails, and purlins — covers working at height on open steel frames, leading edge work, and falling objects.
Start with this job →What You Get
Job-specific RAMS
Describe your job and get professional risk assessments covering falls from height and other trade-specific hazards.
Construction Phase Plans
CDM 2015 compliant CPPs created from your job description. Covers management arrangements, risk control, welfare, and emergency procedures.
COSHH Assessments
Smart substance search and SDS upload. Pre-loaded with common steelworker substances like welding fume (contains manganese, chromium vi, and iron oxide particles).
Site Inductions
Digital induction sign-offs for every worker on site. Linked to your CPP and site rules. Works on any phone or tablet.
Worker & subcontractor tracking
Track certifications, insurance, and CSCS cards. Get alerts before documents expire. One view for all your workers.
Digital document sharing
Share your full document pack with clients, principal contractors, or inspectors via a secure read-only link. No login needed on their end.
Common Hazards We Cover
These are the real risks steelworkers face on site every day. Your RAMS will address each one with specific control measures.
- Falls from height — steelwork erection involves working at the leading edge on open frames before permanent decking and guardrails are installed
- Crane operations — lifting and positioning heavy steel members requires precise planning, signalling, and exclusion zones
- Crush injuries — steel members can weigh tonnes and a failed connection, dropped beam, or uncontrolled swing can be fatal
- Welding fume exposure — manganese, chromium VI, and iron oxide fume from welding structural steel
- Manual handling of heavy components — even domestic RSJs can weigh 100kg+ and require mechanical aids or team lifts
- Structural instability during erection — partially erected frames can collapse if temporary bracing is inadequate
What's included at each tier
Starter
£0- Risk Assessments (RAMS)
- Construction Phase Plans (CPP)
- Site inductions
- Worker document signing (no per-signature charge)
Pro
£39/mo or £360/yr- Risk Assessments (RAMS)
- Construction Phase Plans (CPP)
- Site inductions
- COSHH assessments (standalone doc, SDS upload, site-specific register)
- Worker cert tracking and expiry alerts
- Right-to-work evidence records
- Subcontractor tracking
- Toolbox talks
- Worker document signing (no per-signature charge)
- Integrations (Drive, Xero, Zapier)
Business
£199/mo- Risk Assessments (RAMS)
- Construction Phase Plans (CPP)
- Site inductions
- COSHH assessments (standalone doc, SDS upload, site-specific register)
- Worker cert tracking and expiry alerts
- Right-to-work evidence records
- Subcontractor tracking
- Toolbox talks
- Worker document signing (no per-signature charge)
- Integrations (Drive, Xero, Zapier)
- Up to 10 internal team logins
- Site Supervisor: a field-only login for whoever runs the site
- Up to 50 active site portal users
- Site attendance check-in/check-out
- Multilingual worker inductions (9 languages)
- Optional 4-digit PIN for shared-link document sign-off
- Slack Site Ready readiness checks
Site Control
£675/site/mo- Risk Assessments (RAMS)
- Construction Phase Plans (CPP)
- Site inductions
- COSHH assessments (standalone doc, SDS upload, site-specific register)
- Worker cert tracking and expiry alerts
- Right-to-work evidence records
- Subcontractor tracking
- Toolbox talks
- Worker document signing (no per-signature charge)
- Integrations (Drive, Xero, Zapier)
- Up to 10 internal team logins
- Site Supervisor: a field-only login for whoever runs the site
- Up to 50 active site portal users
- Site attendance check-in/check-out
- Multilingual worker inductions (9 languages)
- Optional 4-digit PIN for shared-link document sign-off
- Slack Site Ready readiness checks
- Permanent entrance QR: guest sign-in and contractor self-join
- CSCS credential capture, review and expiry alerts
- Digital induction gating before check-in
- Live people-on-site, attendance and audit-grade exports
- Single sign-on (SSO) with Okta or Microsoft Entra
- Public REST API with scoped account keys
- Signed real-time webhooks into your own systems
Running live sites with subcontractors? Site Control is the per-site enterprise tier above Business — entrance QR sign-in, CSCS checks, induction gating, live attendance and audit-grade exports. From £675/site per month, plus £5,000 setup.
Frequently Asked Questions
- Do I need RAMS as a steelworker?
- Yes. Structural steelwork is high-risk work under CDM 2015. It involves crane operations, working at height on open frames, and handling components that can weigh several tonnes. Principal contractors and clients will require comprehensive RAMS that cover the erection sequence, crane lift plans, fall protection, and temporary stability. Generic templates are not acceptable for steelwork.
- How long does it take to create RAMS for steelwork?
- Under 5 minutes with The Site Book. Describe the job — for example, 'steel portal frame erection for a single-storey industrial unit' — and the AI generates RAMS covering crane operations, erection sequence, fall protection, welding, and temporary bracing, specific to your project.
- Does The Site Book cover BS 5975 and temporary works?
- Yes. The Site Book generates RAMS that reference BS 5975 (Code of Practice for Temporary Works) for erection sequence planning and temporary stability. It covers temporary bracing requirements, the role of the Temporary Works Coordinator, and the need for method statements that match the structural engineer's erection drawings.
Why The Site Book
- UK construction compliance tool that ships RAMS + CPP + COSHH + inductions (readable and acknowledgeable in 9 worker languages on Business, with the language audit-recorded) + worker sign-off, including optional 4-digit shared-link PIN evidence on Business, plus site attendance, portal users, site files, document reviews, subcontractor evidence and inspections/actions.
- Generate a site-specific RAMS first draft from a natural-language brief in under five minutes, ready for competent-person review - not a template library you hand-fill.
- Controlled document workflow without an enterprise contract: version history and a recorded issue confirmation before a document is shared with a client or downloaded in the app on every plan, re-sign on revision with superseded signatures preserved plus PCPP import, cert tracking and document checking from the £39/month Pro plan - and on Business, optional named-approver routing (a designated approver accepts or rejects each version, with recorded reasons, before it can be issued) plus client approve/reject/request-changes via share links.
- Transparent pricing: Starter £0, Pro £39/month or £360/year, Business £199/month with 10 management logins and 50 active site portal users. Worker document signing has no per-signature charge; project workers count as active portal users while assigned.
- Build RAMS for any trade - add your own work types and method statements alongside the built-in library, reusable across projects, including a ready-made Commercial Solar PV group. Save a finished job as a reusable project template, or clone it, so the next job of the same shape starts from your own setup.
- COSHH goes deep: a standalone COSHH assessment document, upload-a-Safety-Data-Sheet extraction, a site-specific substance register and an expert-reviewed library - plus per-worker RAMS sign-off and a one-click Audit Pack covering documents, sign-offs, worker evidence, attendance, incidents, COSHH, permits and up to the latest 500 live Site Diary entries.
Ready to stop writing RAMS by hand?
Describe your job, get professional RAMS, CPP, and COSHH assessments in minutes. No credit card required.