Build your method statements on the Methods tab

Available on all plans

Open your project and click the Methods tab. This is your sequence of works: every task the job involves, each with a step-by-step safe system of work that becomes your RAMS method statements. Changes here are saved to this project only.

For how a method statement links to the risk assessment, see the method statement guide.

Add and personalise tasks

  1. Open Add trade task and search the library.

    Tasks are grouped by trade — plumbing, roofing, groundworks, maintenance and repair, fabrication and welding, cleaning and so on.

  2. Expand a task to edit its Method Statement.

    Changes save automatically when you tap outside the box. Edited tasks show a "Personalised" badge, with Reset to default if you want the library version back. A box asks Are you sure? first — click Restore default to discard your edits, or Cancel to keep them.

  3. Reorder with Move up / Move down to match how the job actually runs.

Custom work types

For work that isn't in the standard library, use Add custom work type: pick from your personal library or Create new with a trade, task name and method statement. Personal is the default. Business and Site Control also offer the Company library; owners and admins can use Copy to company library to make an independent shared work type. A duplicate name needs a different name before copying. Custom tasks appear after the library tasks in your method statements. Company copies survive their creator leaving; personal originals are not moved.

Generate the RAMS in the mobile app

The signed-in mobile app can generate the RAMS PDF directly. Open the project's Documents tab, tap + Generate document, choose RAMS and follow the steps: select every hazard the work covers from the project's hazard catalogue (your own saved custom hazards are offered too, and site-specific hazards are always included automatically), optionally pick the personnel on the method statement, and name the works supervisor if there is one. Selecting a hazard turns on Submit; the app keeps your selections as a draft as you go, and if Submit loses its connection, the app checks on its own whether the RAMS finished; if it didn't, tap Finish RAMS on the project's Documents tab.

The generated RAMS scores exactly the hazards you selected, plus the hazards attached to the project's method-statement tasks — add or review those tasks in the Methods tab first, because a RAMS is not generated until at least one task exists. Hazard risk ratings show Not rated rather than a made-up level when none is recorded. The works supervisor prints as the approver unless your account's default approver rule applies, in which case the server prints its own resolution.

On the mobile app, open the project's Methods screen and tap Add a task. Use New custom task to save explicit trade, task and method steps onto this project, or pick from Personal work types. Business and Site Control also have an explicit Company choice for authorised teammates. A saved type is copied onto the project (a type already on the project shows Added). Project copies carry a Custom badge; editing one never changes your saved type. On the website, Save to the company library for reuse starts unchecked; select it only when you intend to create a shared company work type.

When the list is right, generate the RAMS — the "What you're doing" step shows the same tasks.

See the hazards your RAMS will draw on (mobile)

The mobile Add a task screen also shows Hazards on this project. It lists the real hazard library grouped by category, your own saved custom hazards, and the project's site-specific hazards marked Auto-included (these are always part of your RAMS, however they were added). Hazards with no risk rating show Not rated rather than a made-up level.

This list is read-only — you choose which hazards apply when you generate the RAMS, and manage your own saved hazards under account settings.

Frequently asked questions

Can I write a longer custom task on my phone?

In Method statements → Add a task → New custom task, enter Trade, Task and Method steps. The task form scrolls the focused field above the keyboard. Existing tasks' View / edit editors also scroll their method statement into view. Scroll to the relevant save action when ready, or choose Cancel in the new-task form to close it without saving.

Why does my RAMS refuse to generate without a task?

A RAMS must include a method statement, and method statements are built from your trade tasks. Add at least one task on the Methods tab (or in the RAMS wizard's "What you're doing" step) and it unlocks.

Will a PDF import add tasks back after I remove them all?

No. When you remove the last task, your empty list is saved as your choice, so a PDF import that finishes later will not add suggested tasks back. Cloning a project or creating one from a template also keeps its task selection, including an empty list.

Are there ready-made tasks for maintenance, welding or cleaning work?

Yes. On the project's Methods tab, open Add trade task and type the trade or task into Search trades or tasks..., or expand the trade's heading. Maintenance & Repair covers reactive repair visits in a building that is in use, planned maintenance visits, minor ceiling, wall and floor repairs, and replacing fixtures, fittings and ironmongery. Fabrication & Welding covers welding on site, cutting and grinding metal on site, installing fabricated steel or pipework, and repair work on plant or machinery that has been isolated. Cleaning covers pressure washing, window cleaning, clean after building work and industrial floor cleaning. Click a task to add it, then expand it to personalise its Method Statement for your job. Adding tasks needs an owner or admin account.

My trade or task isn't in the library — what do I do?

Add it under "Custom work types": set the trade, task name and method statement. Saving for reuse uses your personal library by default. Business and Site Control owners and admins can explicitly create or copy a work type into the Company library for authorised teammates. On the mobile app's Methods screen, tap Add a task and use New custom task — that adds it to the project you're on.

If I edit a method statement here, does the issued RAMS change?

No — generated documents are frozen snapshots. Edit the task, then regenerate the RAMS so the PDF picks up your wording, and workers re-sign the new version.

Why am I being asked to reload the saved task list?

If the Methods tab confirms that the saved task list changed, that change was not applied; review the refreshed list before trying again. In the RAMS wizard, open Order of work and choose Reload saved task list, then review your selection before generating. Pending site-specific notes are kept for matching tasks. Tasks deleted from the saved list stay removed. An addition is kept only when the draft's saved task list confirms it was new; for older drafts without that evidence, review the saved list and re-add any missing task and its note. Older mobile app versions that cannot confirm the saved list need updating; use the website if you cannot update. If your connection drops without a confirmed conflict, check the saved list before retrying because the result may be uncertain.

What's the difference between a site-specific note and a method statement edit?

On the RAMS wizard's Order of work step, Add site-specific note adds an instruction for this job after the task's method steps. To change the full step-by-step method statement, open the project's Methods tab and edit the task there. A wizard note never replaces those steps.

If I edit a custom task on a project, does my saved custom work type change?

No. Adding a saved personal or company work type to a project creates a project copy. Edits and deletions on that copy apply to that project only. Changing a library does not rewrite existing project copies or issued PDFs. Your existing personal work types stay yours; Business and Site Control owners and admins manage the separate Company library, which authorised members can reuse within their existing project permissions.

Why can't I add or edit tasks on the Methods tab?

Adding, editing, reordering and removing tasks needs an owner or admin account. On the website, team members can open the project's Methods tab and expand any task (or custom work type) to read its method statement, but Add trade task, Add custom work type, Move up / Move down, Reset to default and Remove from project are hidden, and a note at the top says only an account owner or admin can change them. The mobile app's Methods screen works the same way, and also hides the controls while a plan is inactive. Ask an owner or admin to make the change.

Why was a task-list change refused after I opened the project?

Your owner or admin access and the account's ability to make changes are checked again when the task list is saved. If your team role changed, you were removed, or the account became read-only while you were editing, the change is refused. Reload the project's Methods tab and ask the account owner to resolve access or billing before trying again.

Related guides