Skip to main content
Start your first project →

Projects

Create and manage projects — from plain-English setup to PCPP import, cloning and templates.

Create a project

Start a project three ways: describe the job in plain English (typed or spoken), upload a pre-construction plan PDF, or fill the form in manually.

Available on all plans

Edit project details — and set emergency info once

The Details tab holds your project, site, people, safety and emergency information. Emergency details entered here feed every document automatically.

Available on all plans

Site Info: upload a PCPP and manage site background

The Site Info tab holds your pre-construction pack and site background — client, site knowledge, rules, welfare and fire plan — feeding your CPP and AI.

Available on all plans

Site Safety Setup: fill the 11 details that unlock your documents

Complete the 11 site safety details that unlock your CPP, RAMS, induction and emergency plan — with AI drafts, PCPP pre-fill and a nearest-A&E lookup.

Available on all plans

Build your method statements on the Methods tab

Manage the sequence of works: pick trade tasks, personalise each safe system of work, and add custom work types. It all feeds your RAMS.

Available on all plans

Add site photos and plans to a project

Upload site photos and plans on the Photos tab, title them, and tick the ones to include in your Construction Phase Plan.

Available on all plans

Log incidents and near misses (with RIDDOR flagging)

Record incidents and near misses against the project — timestamped, with automatic RIDDOR flagging and a record of what you reported to the HSE.

Pro and above

Issue and track permits to work

Issue permits for high-risk work — hot works, confined space, excavation and more — with who issued, who received, and when it expires.

Pro and above

Store permits your client issues to you

When you work on a client's site — a hospital, school or factory — they issue the permit to work. Photograph it at the gate and it's on the job for good.

Pro and above

Keep a site diary

A short entry each day: weather, who was on site, what got done, issues, delays, visitors and photos — gold if a dispute or claim ever comes up.

Pro and above

Use the F10 page in your project

See if your job is notifiable, copy its details into the HSE's own F10 form, and record the date you sent it. The rules are in our F10 guide.

Pro and above

Embed the free F10 checker on your website

Add our free F10 notifiability checker to your own website: copy the embed code from the F10 guide and paste it anywhere HTML is allowed.

Available on all plans

Plant & Equipment: run one live register of your kit

Keep a company-wide register of plant and equipment, set the evidence each item needs, and see at a glance what is compliant, expiring or unsafe.

Advanced and above

Can't find what you need? Search the help centre or email [email protected].