Edit project details — and set emergency info once
Available on all plans
Open your project and click the Details tab. Everything that describes the job lives here in five sections — and because documents render from these fields, keeping them right keeps your paperwork right.
What's in each section
Project Details — title, scope, reference, dates, estimated workers (leave it blank or enter 0 if you don't know yet; documents still create and none prints a workforce of zero). Site — the address (pick from Use a saved site if you've saved one), directions, access and delivery arrangements. People — client, principal designer, architect, engineer, works supervisor, with Use saved contact pickers. Safety — site rules, welfare facilities, key risks, training requirements. Emergency Information — see below.
Click Save Changes when you're done.
Emergency Information — set once, used everywhere
Fire strategy, fire assembly point, emergency procedures, emergency scenarios, utility isolation points, nearest hospital and first aid arrangements are entered once here. Your CPP, RAMS, Site Induction and Emergency Plan all render from these fields — the wizards never ask for them again.
Remember that generated documents are frozen snapshots. Changing the project title or address puts every issued project document that prints it — including Toolbox Talks and COSHH assessments — into Review due. Changes to the reference, scope, programme, contractor role, client or designer directory, workers, subcontractors, trade tasks, custom hazards, COSHH assessments, selected project photos, site supervision, directions, access, delivery, public-protection, hoarding, safety or emergency details mark only the issued PDFs that contain those facts. Review and regenerate the affected document before treating it as current. If details change while a PDF is still being prepared, that older generation is discarded and you are asked to try again from the latest details.
Use project controls in the mobile app
Owners and Admins can edit project details and use project management controls on every plan tier while their account allows changes. Members can manage the project worker list, but cannot edit project details. Site Supervisors do not see those management buttons. If your account is read-only or mobile changes are temporarily unavailable, the corresponding buttons are hidden.
Open Projects, choose your project, then tap Edit in the header.
Update the project details, including client and contact details, Start date, End date, Estimated workers on site and Site directions, then tap Save changes. Choose dates from the calendar or enter them in DD/MM/YYYY format; the end date cannot be before the start date. Estimated workers must be a whole number of zero or more; zero counts as not set, so your documents still create and none of them prints a workforce of zero. Choose Choose a saved site to select a saved site; selecting it replaces the project address and links that project to the saved site. The editor does not show which site is currently linked. Only details you changed are sent; clearing an optional text field saves it as blank. If a teammate changed the same text or date while you were editing, the notice above Save changes shows the current project value beside yours. Choose Use project text or Keep my text for each conflicting detail, then tap Save changes again. Your other edits stay in the form. The site address and its emergency details are checked separately; if the app asks you to reload, leave Edit, reopen the project and make those changes from its current details. Editing the address manually clears an existing saved-site link; choosing a saved site explicitly sets the address and link together.
Record who is working on the job.
Open the project's Workers screen and add each person who is working on site. If the project list is empty and you are doing the work yourself, tap Confirm it's just me. The app checks the project list before saving the confirmation; if workers are listed, add or review them instead.
Scroll to Actions for project management.
Use Clone project to make a copy, or Archive project to move an active project to the Archived list. For an archived project, the same section shows Reactivate project to return it to the Active list. Confirm with Clone project, Archive or Reactivate in the box that opens, or click Cancel to leave the project as it is.
Frequently asked questions
Can I use larger text in the mobile app?
Yes. The app follows your phone's text-size setting. Its bottom bar (Home, Projects, Workers, Subs, More, the same as the website on a phone) grows to make room for larger labels; longer labels can wrap across lines. Site supervisors see Projects and Workers only, as on the website.
Why does the top of an app screen show the project or person's name?
When you open a project, document, worker, subcontractor or plant item in the app, the bar at the top shows its name, so you always know where you are. A long name is shortened with … to leave room for the back arrow. While the screen is still loading, the bar shows a general word such as Project or Worker instead.
Where do I add key site contacts on my phone?
Open the project and choose Edit, then scroll to Key site contacts. Enter the works supervisor and phone number, document author, principal contractor, principal designer, architect or other contacts that apply to the job. Leave roles that do not apply blank, then choose Save changes. Existing contacts appear in the form and can be corrected or cleared. If someone else changed a contact while you were editing, review the conflict before saving again. Older installed apps may not show these fields until the next mobile update; use the website's project Details form meanwhile.
Why does the site induction ask a project manager to shorten details?
An unusually large project field cannot fit in the signed view kept with a worker acknowledgement. Open the project’s Details tab, select Edit Project, and read the notice above the form for the exact fields. Shorten those fields and select Save Changes. Ask the worker to reload the site QR page or portal and review the current details. Existing signed acknowledgement records are unchanged.
Why does readiness on my phone still ask me to create a site induction?
A blank induction draft is not a generated document. Generate an induction before collecting its worker sign-offs. Opening a draft does not count as creating or signing the induction.
Where do the readiness rows on my phone take me?
Tap a row to go where it is fixed. Company details opens Profile (also under More → Settings), where you enter the company name, address and email. Expired worker certificates and Worker certificates expiring soon open your company's workers list; open the worker to upload a new certificate. These open on top of the project, so the back arrow (or your phone's Back button) returns you to it. Subcontractor paperwork not uploaded and Expired subcontractor documents open the project's Subcontractors screen, which marks each firm Paperwork missing, Paperwork expired or Paperwork in date; tap Paperwork on a firm to open it, then Add or update paperwork (Pro and above). Site supervisors cannot open company settings, so a company details or worker certificate row says who updates it instead.
How do I refresh the readiness checks on my phone?
Open the project's overview and pull down to refresh both its details and readiness checks. Changes to the project's role, people or subcontractors, completed generation and document approval decisions also refresh the affected checks. A saved change does not itself mean the project is ready: review any requirements that remain before generating or issuing paperwork.
How do I finish the full project-input review before generating on my phone?
In the CPP or RAMS wizard, Review current project opens the complete current snapshot, including relevant people, hazards and photos. Scroll through those details and make every required choice between your saved answers and current project text. Continue with reviewed answers and Cancel review remain below the scrolling details so you can reach them without scrolling through the entire catalogue. Continuing accepts the review; it does not generate the document. Submit again when you are ready. If inputs change again, the app requires another review.
How do I find archived projects on my phone?
Open Projects and choose Archived to list archived jobs, Active for active jobs, or All for the full accessible list. The status filter applies before each page is loaded, and search narrows the projects in that selected list. Changing the filter does not archive or reactivate a project.
Can I confirm that I am the only worker on a project?
Yes. In the Site Book app, open the project's Workers screen. When no project workers are listed and your account allows changes, choose Confirm it's just me. The app checks the current project roster before saving this project-specific confirmation. If anyone else is working on site, add them to the project instead; the confirmation is not a substitute for recording the crew.
Can I finish the site-safety form or name a template while the phone keyboard is open?
Site-safety setup scrolls the focused field above the keyboard. The Save as template dialog also scrolls as a whole so its name and actions remain reachable. Scroll to the relevant save action when ready; dismissing the keyboard does not save either form.
How do I edit the lower site details while typing on my phone?
In Edit project, tap the field you need. The form scrolls above the keyboard so you can reach site rules, welfare and emergency details. Scroll to the controls when finished. Closing the keyboard does not save changes; use Save after reviewing them, or leave without saving.
Why doesn't the RAMS wizard ask for my assembly point?
Because you set it once on the project's Details tab, under Emergency Information. Your CPP, RAMS, Site Induction and Emergency Plan all draw from there — you're never asked twice. Change it in one place and regenerate the documents that use it.
Can I change my CDM role after creating the project?
Yes — the top of the Details tab has the role selector (Principal Contractor, Only Contractor, Subcontractor). Changing it adjusts which documents and tabs apply.
I changed the site address and my assembly point, isolation points and A&E are now blank — why?
Those three answers describe a place, not the work: the fire assembly point is where this site's crew musters, the utility isolation points are where this site's shut-offs are, and the nearest A&E is worked out from this site's address. When you move the job, any values left unchanged from the old address are cleared rather than printed on the new site's Emergency Plan. You can replace the assembly point, isolation points or A&E while changing the address in the same save; replacements you actually type are kept for the new address. For the hospital, use Look up nearest A&E from the site address or enter a confirmed A&E manually. Until all three are filled in, your CPP, RAMS, Site Induction and Emergency Plan stay locked and the generate screen names the missing field. Everything else on the project — scope, dates, people, site rules, welfare — is untouched. On the website, when you click Save Changes after changing the address, a Clear these safety answers? box first lists the answers that will be cleared: click Go back to change your mind, or Save and clear them to save. The Site Book app on your phone does the same: open the project, choose Edit, change Site address (or tap Choose a saved site) and choose Save changes, and the same Clear these safety answers? box lists the answers first, with Go back and Save and clear them. Go back keeps what you typed and saves nothing. The app's Edit screen has no A&E lookup, so a nearest A&E only survives a move there if you type the new site's A&E into Nearest hospital (A&E) in the same save, or, when you choose a saved site, only if that site already has a confirmed A&E (a typed one is not used then); otherwise fill it in afterwards in Site Safety Setup. Only tidying the postcode — moving it out of City / Town into Postcode, or changing its capitals or spacing — is not a change of address, so nothing is cleared and the box does not appear. A different postcode is a change of address.
What happens if someone changes the project while I have the Details tab open?
On the website, Save Changes on the Details tab sends only the details you changed. Anything you left alone is not written, so it cannot overwrite a newer value. If somebody else changed one of the details you edited after you opened the tab, nothing is saved and a notice at the top of the page shows, for each detail that changed, what the project says now beside your text. For each one, select Use the project's text to take theirs, or Keep my text to replace theirs with yours, then select Save Changes again. Your other edits stay in the form until you save. The same applies to the scope, start date and duration on the Overview's Project basics (each has its own Save), and to the setup page a subcontractor job opens before RAMS: Save and continue and Save progress and come back later show the notice and keep you on the page. Your role, the estimated number of workers and the site address are saved as you set them. The assembly point, utility isolation points and nearest A&E are checked separately: if they changed while your page was open, nothing is saved and a notice at the top of the page asks you to select Reload this page and make your changes again.
Does opening a project after switching accounts move it to that account?
No. Opening a legacy project or changing your selected account does not change who owns that project. Some account-scoped integrations may not be available for a legacy project until its account ownership can be established from reliable records. Contact support if you need help confirming ownership; do not assume that opening the project transfers it.
How do I find the nearest A&E?
In the Emergency Information section, click "Look up nearest A&E from the site address" — it finds the closest hospital from the site address you've entered. A full postcode makes it far more reliable, so add one if the address doesn't have it yet. If we can't place the address, or there's no A&E within 20km, you'll be told to enter it manually rather than shown a guess — we never put an invented location on a safety document. You can always type it in yourself.
Why was I asked to review the latest project details and generate again?
Someone edited or imported project details while your PDF was being prepared. The Site Book discards that older snapshot instead of publishing it as current. Review the latest details, then click Generate again.