Generate a Construction Phase Plan (CPP)

Available on all plans

Open your project, go to the Documents tab and start the CPP. The AI sets up the site management and risk sections from your project details while you work through the steps.

When you choose Continue from last version on the website, an older CPP may show a warning naming answers that were not saved with that version. Open the previous CPP, check those details, and re-enter anything needed before creating a new version. A blank answer in this case does not confirm the previous plan omitted it. A start date or Prepared by recorded as blank stays blank when you reopen the website wizard; only a missing legacy answer uses the project date or signed-in name. If the current CPP version cannot be read for this project, generation stops instead of treating it as a new plan.

The signed-in mobile app can also generate the full plan: from the project's Documents tab, tap + Generate document, choose Construction Phase Plan, and fill in the site management, risk-and-safety details — principal designer, architect, client contact, start date, access, deliveries, permits and more. Only project details you deliberately change are saved back. An untouched field uses the project's current saved value, shown greyed in the field. Clearing a field you edited is an explicit change; required site-safety details must be completed before generation. Submit needs current write access and an eligible project; if Submit loses its connection, the saved request can be checked and its original version reopened. Home refreshes its document totals after the app confirms generation, including when a recovered result is checked.

When you regenerate the plan in the app, the plan-only details start from your current version: the start date, Prepared by, Approved by, public protection, asbestos, permit-to-work and environmental. A recorded blank start date or Prepared by stays blank when reopened or recovered. The project date and signed-in name are defaults only when those answers were never recorded. A blank optional answer can appear as Not recorded in the PDF; check the plan before issuing it. If your account prints a default approver, the editor shows that name read-only in place of Approved by. The new version keeps the site photos in your current version and adds any photo ticked Include in CPP on the project's Photos screen; the editor says how many. If your current version was made before those plan-only details were kept with it, a note at the top of the editor names the ones to re-enter, with an Open version button to check them against that plan. After a version is generated in the app, its saved answers are cleared, so the next regeneration starts from that version. If saved answers came from a different CPP version, or an older app did not record their source version, the app asks first: tap Start from version N to use the current version, or Keep my saved answers. If there is no current CPP version to choose from, the app says it could not confirm which version the saved answers came from and offers Start fresh or Keep my saved answers after review; it does not claim a version was deleted or superseded. A later autosave does not hide that question. If another manager creates a newer version while you edit, Submit refuses the old request. Tap Review current CPP, check the newer version and your saved answers, then submit a new request. If the current CPP cannot be reloaded, tap Try again before editing.

New to CPPs? Start with what a construction phase plan is and who needs one.

Check the plan against the actual job

In the full website wizard, open Risk & Safety and use What safety arrangements are in place? to explain the controls for significant risks, who is responsible, worker briefings, coordination and when the plan is reviewed. In the lightweight wizard, include the controls and responsible people in Site risks & hazards. Naming a hazard or a qualification alone does not describe how the work will be managed.

The plan identifies Full or Lightweight and includes your saved emergency and supervision details. On the website, open Edit project → Emergency Information to check Emergency Scenarios, Utility Isolation Points, fire and assembly-point details. Under Edit project → People → Works Supervisor, check the supervisor's Name and Phone. A missing supervision detail prints Not recorded. Check the finished PDF before issuing it. Earlier PDFs and signed documents keep the details they were created with.

For domestic work, confirm who carries the client duties: the contractor on a single-contractor job, normally the principal contractor where more than one contractor is involved, or a principal designer under a written agreement. The plan does not appoint someone automatically. Check the actual contractors involved, dates, welfare, emergency contacts and agreed controls; a company count is not a verified headcount or a safety approval.

Walk the wizard

On a phone, the Step 1 of 6 · Project Team bar above the wizard shows where you are — tap it to list all six steps and jump back to any you've completed.

On the website, both the full and lightweight CPP require you to choose Use suggestions or Keep project details when AI proposes site-management changes. Review saved differences separately with Use saved details or Keep current project details before creating the full plan. In the signed-in app, review the current and saved details shown by the editor before choosing Keep my saved answers. After Review current project, compare every value that changed while you were editing. Choose Use current project value or Keep my saved answer for each conflict, then Continue with reviewed answers before generating. New AI suggestions and answers restored from a previous version remain proposals to review, not automatic changes to the Project.

Mobile draft saves run in order. Start fresh clears the previous draft without an older background save restoring it. A successful mobile session refresh keeps your answers when the app can verify the same account and project. When an older server omits the account scope, the refreshed form reloads any saved draft and retires pending work; switching project loads that project’s own draft.

  1. Project Team — confirm who holds which CDM role on the job.

    Each role (Client, Principal Designer, Principal Contractor, Architect and Structural Engineer) has a Company, Contact name, Phone and Email box. They print in the plan's CDM Duty Holders table and are saved to the project. The Principal Contractor boxes start with your company details when the project has none, so check them if someone else is the Principal Contractor. Architect and Structural Engineer are optional: leave them blank if the job has neither, and the table leaves them out. The summary table on the plan's first page uses the same details: each role's company (or the contact's name when no company is entered) and that role's own phone number, so PC Contact Phone shows the Principal Contractor's phone. If Review & Suggestions says a role is empty, its Edit link brings you back to this step.

  2. Site Management and Risk & Safety — review the AI's pre-fill.

    These sections auto-fill from your project (you'll see "Setting up your site safety plan" while it works — skip it if you'd rather fill them yourself). Adjust anything that doesn't match how you'll actually run the site.

  3. Welfare & Emergency — confirm welfare arrangements and emergency details.

  4. Site Photos — add photos if you have them (optional). Wait for Photo uploaded before relying on a new photo. If upload confirmation fails, check the project's photos before trying again. If saving the project's Include in CPP photo setting cannot be confirmed, the wizard keeps your selection for this CPP and shows a warning.

  5. Review & Suggestions — check the flagged items, then click Create CPP.

What the AI pre-fill will and won't say

AI can propose rules, scope-related risks and general procedures for review. It cannot confirm site facilities, locations or named people from a job description. In the lightweight CPP wizard, AI leaves an empty Welfare facilities answer alone and shows Site detail needed so you can enter the actual toilet, washing, drinking water and rest facilities and their locations. It does not fill an unknown answer with "to be confirmed".

Complete your project and site details with confirmed facts before generating, and always review any AI-drafted wording before you approve.

The lightweight CPP for small domestic jobs

If your project qualifies (domestic client, you're the only contractor), the wizard opens in its lightweight form automatically — fewer questions, proportionate output. You can switch to the full wizard from inside it if the job needs more.

In the signed-in mobile app, the lightweight editor asks who prepared the plan and shows the current project scope, client, risks and welfare. Change those facts in Project details or Site safety before generating. An older mobile CPP draft is retained for explicit review before the lightweight editor may replace the shared CPP draft. If Submit loses its connection, the app checks on its own whether the CPP finished; if it didn't, tap Finish Lightweight CPP on the project's Documents tab. Home refreshes its document totals after the app confirms generation, including when a recovered result is checked.

After generating

Your CPP unlocks RAMS generation when you're running the job. Open the document from the project's Documents tab. In the signed-in app, the completed-generation screen keeps the generated version available; choose Make a new version there when you are ready to prepare another version of the CPP. The app reloads the current CPP and project inputs before opening the next form. People with access can click Download for the PDF when any required approval and issue checks pass. On a team account, only an owner or admin can click Share on the document page, choose View only, then click Create Share Link to send a read-only link to your client or principal designer. CPPs don't collect worker sign-off — that's what inductions, toolbox talks and RAMS are for.

Frequently asked questions

The website says a draft was saved in the Site Book app. What do I do?

On the website, open the CPP wizard from the project's Documents tab → CPP. If you started the same document in the Site Book app and it saved a draft, a warning at the top of the wizard says so, and the website does not save over that draft. To keep working in the app, close the wizard and finish it there. To work on the website instead, click Discard the app draft and continue here: the app draft is deleted (this cannot be undone) and the website saves your answers from then on. The warning only covers your own drafts; a colleague's draft of the same document does not block you.

Can I enter CDM duty-holder contacts in the Android app?

The updated full CPP editor groups the Client, Principal Contractor, Principal Designer, Architect and Structural Engineer separately, with company, contact name, phone and email fields. You can also edit these contacts in the project details. For a new plan, your company details fill missing Principal Contractor details when no Principal Contractor company is recorded; subcontractor jobs keep their own Principal Contractor details. Review the contacts before generating. Saved drafts retain deliberate edits and clears. If a saved draft contains contact fields your installed app cannot display, update the app before editing that draft.

How do I keep my answers if draft saving pauses?

If the wizard says draft saving has paused because the last save could not be confirmed, keep that wizard open. Your latest answers remain in the open form, but later edits are not being saved to the draft. Copy any text you need to keep before leaving the page. You can still review the current answers and create the document when its normal checks pass; confirmation that the document was created does not confirm that the old draft was removed.

What if another CPP is created while my website wizard is open?

If another tab or manager creates a newer CPP before you select Create CPP or Generate as-is, your older wizard cannot replace it. No CPP is created from that submission and your answers stay visible in the open wizard. Copy any edits you want to keep, then reopen the CPP wizard from the project's Documents tab to review the current version before creating another. This also applies to the lightweight CPP and to two wizards opened before the first version exists. A form opened before version checks were added also asks you to reopen it. If an autosaved full-CPP draft came from a different version, or its source was not recorded, Review saved plan answers asks you to choose Use current version's plan answers or Keep my saved plan answers before creation. Review the current plan and your saved text before choosing. Use current version's plan answers takes the opened version's answers even if you chose to start with AI. Refreshing the page data does not change the source of answers already open in the wizard.

Why is the lightweight CPP form briefly unavailable when it opens?

The form becomes editable once it is ready to keep your changes. This prevents your typed answers being mixed with the project's initial text while the page opens.

Will creating a CPP change my saved project details?

Site-management fields you leave unchanged use the project's current saved details. A change you make on the website wizard is saved to the project when you generate, and that includes clearing a field: if you empty a detail you had edited, it is cleared on the project too, so the plan cannot print the old text back. A field you did not touch keeps its saved project value. On the website, differing details restored from an earlier version or draft are shown separately: choose Use saved details to accept them or Keep current project details to retain the current project values. New AI suggestions also need a choice before generation: Use suggestions accepts them and Keep project details keeps the current values. In the app, the current project details remain active until you explicitly choose Keep my saved answers for the saved differences. Check the finished plan before issuing it. Earlier PDFs stay unchanged.

What happens if someone changes the project while I have the CPP wizard open?

On the website, when you select Create CPP (or Generate as-is), the wizard writes back to the project only the details you changed. A detail you left alone, or typed into and then put back, is not written, so it cannot overwrite a newer value. If somebody else changed one of the details you edited after you opened the wizard, no CPP is created and none of your changes are saved to the project. A notice at the top of the wizard shows, for each detail that changed, what the project says now beside your text. For each one, select Use the project's text to take theirs, or Keep my text to replace theirs with yours, then select Create CPP (or Generate as-is) again. Your answers stay in the wizard until you choose. The lightweight wizard works the same way for Site risks and hazards, Welfare facilities and Site rules and working hours. In the app, generation also checks the Project values your answers were based on. If one of those values changed, no CPP is created and the app shows Review current project. For every changed value, select Use current project value or Keep my saved answer where offered, then Continue with reviewed answers before submitting a new request. A field you deliberately cleared is included in that review; untouched or reverted fields are not written back. Earlier PDFs stay unchanged.

What should I check when the app asks me to review the current project?

In the app's CPP wizard, choose Review current project after a confirmed generation refusal. Wait for your saved answers and the current project inputs to load. Check the project details, workers, subcontractors, COSHH substances and project images shown in the review, including which images are included in the CPP. Make a choice for each changed answer, then select Continue with reviewed answers. Your original request stays saved until that review succeeds. When you reopen saved answers, Submit also asks you to review the complete current inputs before creating a new request. Check them again after closing and reopening the wizard. If the inputs change again before you continue or generate, review them again. An unavailable review keeps the original request so you can retry safely.

How many contractors does the CPP say are on site, and what if I leave Public protection empty?

The Organisations Recorded in This Plan figure on a plan made with the reviewed CPP template is the number the full website wizard shows on Project Team and Review & Suggestions: your company plus each subcontractor linked to the project. Check the listed firms before selecting Create CPP. If a teammate adds, removes or edits one while your wizard is open, creation stops and refreshes the list; check the new list and count on Review & Suggestions, then select Create CPP again. Your answers remain in the wizard. You can add a subcontractor on Project Team but not take one off it: to remove one, open the project's Subcontractors tab (under People) and select Remove on its row, or in the Site Book app tap the firm's Remove button on the project's Subcontractors screen and confirm, then generate the plan again. An empty Public protection answer prints Not recorded under its heading, so the plan never reads as if the question had been answered. Write your actual measures for protecting the public (barriers, hoarding, pedestrian routes) before you issue the plan.

Where does the CPP's Site Access wording come from?

Site Access uses the project's saved access arrangements. It does not copy Site rules into an empty access field. Enter the actual access arrangements in the wizard or update your project details, then check the generated plan. When you continue from a previous version, differing saved site-management answers are proposals to review; the new plan uses current project details unless you accept or edit those answers. Earlier PDFs stay unchanged.

Do I need a CPP for a small domestic job?

CDM 2015 requires a construction phase plan for every construction project, sized to the job. For straightforward domestic jobs where you're the only contractor, we offer a lightweight CPP — the same document type, proportionate content.

What's the difference between the lightweight and full CPP?

The lightweight wizard is a shorter path for domestic only-contractor jobs. You can switch to the full wizard at any point if the job warrants it — both produce a plan that needs review against the actual job before use.

Where do the CPP hazards come from?

For a full CPP, record the main site risks in your project's safety settings. In the CPP wizard's Risk & Safety step, use What safety arrangements are in place? to explain how you will manage them. The PDF includes both answers. In a lightweight CPP, enter this information in Site risks & hazards. A blank site risks, welfare, site rules or emergency detail in the lightweight plan prints as Not recorded under its heading. Check and complete the plan before issuing it.

Where does the full CPP's Workers on Site list come from?

Before generating the full CPP, open the project's Workers page and add or update the people assigned to that job. The plan prints each listed worker's name, company and role with a signature line. If no workers are assigned, the section is omitted. The lightweight domestic CPP keeps its proportionate Site Rules & Worker Induction section and does not add this full-CPP worker list.

Is the CPP free?

Yes — CPP generation is included on every plan. Starter gives you one free real project with no card required; upgrade to Pro at £39/mo when you need project two, your logo or PDFs without the Starter watermark.