Site inductions: generate, deliver and collect signatures

Available on all plans

A site induction is the document every person on site signs before starting work. Generate it once per project; the crew signs digitally from their phones.

Inductions are included on every plan — Starter's one free real project covers generating the induction and collecting signatures, with no card required, so you can run your first site induction before paying for anything. See Plans, billing and your data for what each plan adds.

In the signed-in mobile app, the induction editor collects reporting procedures. When regenerating, it restores the answer recorded in the current induction and carries that version through the saved draft; on a first induction, it starts blank. Site rules, PPE, hazards and worker sign-off come from the project and its current workers; edit those project facts in their own screens. Earlier mobile answers are shown for explicit review before the new editor can replace a saved draft. If a connection fails after Submit, the app checks on its own whether the induction finished; a finished induction appears in the project's Documents list, and if it didn't finish, tap Finish Site Induction there. Home refreshes its document totals after the app confirms generation, including when a recovered result is checked.

For what to cover and how to run one, see how to do a site induction and the site induction checklist.

What the printed induction includes

The induction names the site's manager, principal contractor and client. The Principal Contractor row follows the same rule as the RAMS cover: if you are the Principal Contractor or the Only Contractor, it names your own company with your contact phone; if you are a Subcontractor, it names the project's Principal Contractor, shown as Company (Contact) with their phone, or reads Not named – add in project settings when none is recorded. To add one, open the project, go to Edit project and fill in the Principal Contractor's company, contact name and phone. If no phone is recorded, the row shows the name alone. Its Key Contacts table also prints the client's contact phone and the Principal Designer's name and phone. If you change a printed project name or contact detail after issuing an induction, the issued induction is flagged for review; review and regenerate it to print the updated details. If a name is blank in project details, the PDF prints Not recorded instead of guessing. Principal Site Hazards uses the library and custom hazards saved in the project's current RAMS versions; it does not list the whole library. A RAMS version made since late October 2026 saves its custom hazards with it, so later edits to the project's custom hazards do not change the induction. A RAMS version made before then did not save them, so the induction uses the project's custom hazards as they are now, including any edits made after that RAMS was issued. To fix the custom hazards to the wording in your RAMS, open the RAMS from the project's Documents tab and generate a new version before creating the induction. With no recorded RAMS hazards, that section says Not recorded. Emergency procedure line breaks are preserved in the PDF.

Generate the induction

On a phone, the Step 1 of 2 · Incident Reporting bar above the wizard shows where you are — tap it to list both steps and jump back to any you've completed.

  1. Open your project, go to the Documents tab and start the Site Induction.

    The wizard pulls the site rules, emergency details and welfare arrangements from your project — confirm rather than retype.

  2. Review the draft from the Documents tab.

    Choose Review & Approve to open the draft induction. On a team account, an owner or admin selects ✓ Approve & Lock Document in the document page's Review Required banner. On a phone, open Document menu and select Approve & Lock Document. Repeating that action after a lost connection shows the approved version, not an error — the approval has already landed. The Worker Sign-Off panel appears beneath the induction on the project's Documents tab.

What the AI draft will and won't say

The induction drafts only from your project's own details — the AI never invents site facts (existing roads, gates, parking, building age) or people's names, and anything your project doesn't record is written as "to be confirmed" rather than guessed. Fill in your project and site details first for the best draft, and review it before approving.

Collect the signatures

Send the crew sign-off link — every active worker automatically gets the induction in their portal, and signatures appear live on the Worker Sign-Off panel. If you regenerate the induction, everyone re-signs the new version.

Multilingual crews (Business and above)

On Business and above, workers can read key site H&S details in their own language at the gate and in the portal. The language menu becomes available when the page is ready; choose a language once, then wait for the translated induction to appear before continuing. Review what they'll see under your project's Access tab → Induction translations, or in the mobile app under the project's Site access screen → Induction translations — regenerating a language there asks you to confirm first. English stays the authoritative record.

The wording a worker acknowledged is kept

If a site QR page or worker portal says the induction details need shortening, ask the project manager to open the project’s Details tab and select Edit Project. A notice above the form names the fields to shorten. Save with Save Changes, then reload the QR page or portal and review the current details before acknowledging. New acknowledgements remain paused until a signed view can be issued; existing signed records keep their original wording.

From now on, when a worker acknowledges the site details on the web portal, the contractor mobile app or the site QR pages (portal, site QR check-in, guest check-in or join request), The Site Book keeps a record of the exact details and wording they were shown, in the language they were shown it in. Later edits to the project, or to its translations, do not change what that worker's record says. The record is kept for as long as that acknowledgement record is kept.

Acknowledgements recorded before this change show Original wording not retained instead. A check-in from a remembered phone that was offline at the gate and syncs later records attendance but not the wording shown, so it also shows Original wording not retained. If the site details change before an offline check-in syncs, or an older queued tap has no saved source reference, the phone asks the worker to review the current induction and check in again. A check-in a manager enters from the dashboard records no induction acknowledgement, so there is no wording to show for it.

To see it, open the project's Access tab (Business or Site Control) and, in the H&S attendance section, choose the calendar month in the Month box (it starts on the current month). View audit log opens the first page of raw JSON and includes a continuation cursor; use Download full audit JSON to fetch every page for that month, or choose Export audit CSV for the complete CSV stream. Records follow the order they were recorded, with the event time shown on each row. Each page uses its own database snapshot, so a download is not a frozen view as of its start time: records changed during it can affect later pages. Download again after work has settled when you need a consistent comparison. Owners, admins and project site-access managers can do this. Each acknowledgement lists who acknowledged it, when, and the saved wording; the CSV adds Wording retained, Language shown and Acknowledged text columns. Language shown is the language the details were actually displayed in, so a worker who picked a language with no translation available, and was shown English, reads en. If a saved record's signature can no longer be checked, Wording retained reads yes (signature not verified) and the text starts with a warning; a saved record this version of The Site Book cannot read says Saved wording could not be read rather than claiming nothing was kept.

On Pro and above, the project's audit pack (open the Documents tab and click Create Pack → on the pack card) lists the same acknowledgements: the Site Induction Acknowledgements table has a Wording shown column pointing each acknowledgement to a reference such as W1, and the full pack PDF ends with an Appendix: Site Induction Wording that prints each distinct saved wording once. Acknowledgements with no saved wording say Original wording not retained.

If a builder corrects a translation after a worker opened the page, the worker's confirmation is refused and the page shows the corrected details to review again, exactly as it does when the English details change.

If the project's site details change after a contractor acknowledged them, they must review and acknowledge the updated details before checking in. A check-in cannot rely on an acknowledgement for older site details.

Reloading a guest's browser tab restores a saved-visit recovery panel, rather than a new visitor sign-in form. Sign out that saved visit before using the tab for another visitor. If a connection failed before check-in was confirmed, the saved token lets that visitor retry or recover their visit; it cannot confirm different visitor details as signed in.

Frequently asked questions

How do I keep my answers if draft saving pauses?

If the wizard says draft saving has paused because the last save could not be confirmed, keep that wizard open. Your latest answers remain in the open form, but later edits are not being saved to the draft. Copy any text you need to keep before leaving the page. You can still review the current answers and create the document when its normal checks pass; confirmation that the document was created does not confirm that the old draft was removed.

Can I try a site induction free?

Yes — site inductions are included on every plan. Starter gives you one free real project with no card required: create your account, set up that project, then generate the induction from its Documents tab. Upgrade to Pro at £39/mo when you need project two, your logo or PDFs without the Starter watermark.

How do workers sign the induction?

Send the project's crew sign-off link. Each worker picks their name, reads the induction on their phone and signs — every induction automatically requires sign-off from every active worker on the project.

What happens to incident-reporting answers when I regenerate an induction?

The website and signed-in mobile app start a regenerated induction from the reporting procedures recorded in the current version, so you can review and change them before creating it. The mobile app keeps that version with its saved draft. If an older induction did not record an answer, the wizard says so and links to that version; check it before reissuing. Your project and site details continue to come from the project. If another tab or manager creates an induction while this wizard is open, Create Site Induction refuses the older submission and keeps your answers visible. Copy any edits you want to keep, then reopen the Site Induction wizard from the project's Documents tab to review the current version. A form opened before version checks were added also asks you to reopen it.

The app asks me to review saved answers — which should I choose?

Open the current version to check its reporting procedures. Choose Start from version to use that version's recorded answer, or Keep my saved answers to retain an answer you previously wrote or deliberately cleared. The app offers Keep only when there is a saved answer to keep. Review the choice before submitting; a newer version created while you are editing needs another review.

What happens when I add a worker after the induction is generated?

New active workers are enrolled for sign-off too — the Worker Sign-Off panel shows them as pending until they've read and signed.

Which languages are available for multilingual crews?

On Business and above, key site H&S details can be shown to workers in Polish, Romanian, Lithuanian, Bulgarian, Russian, Ukrainian, Portuguese and Spanish. English is always the authoritative record, and you can review every translation before workers see it.