Skip to main content
Start your first project →

Site attendance: who's signed in, history and reports

Advanced and above

Open your project's Access tab. The H&S attendance section lists everyone who has signed in and not signed out, how long ago they signed in, and gives managers a Check out button — with the full Attendance history further down. On a phone, tap the Jump to section button at the top of the page to go straight to any section instead of scrolling.

Live view and roll-call

The heading under H&S attendance reads N signed in, not signed out. Each row shows the person, company, when they signed in and how long ago, with a Check out button for managers. Nothing closes a sign-in automatically: someone who left without signing out stays listed until a manager checks them out, so the list can include people who have already left. In the Portal users list, a badge shows Signed in or Not signed in for each person. For an evacuation, the roll-call panel at the top of the page snapshots everyone recorded as signed in, and the in-progress heading reads N signed in; anyone on site who had not signed in is not on it.

In the Site Book app on Advanced, Business or Site Control: open the project, tap More at the bottom of the screen → Access, then the Evacuation card. Tap Start evacuation to snapshot everyone recorded as signed in, mark each person Mark safe / Mark unaccounted as you account for them, then End evacuation to stand down once everyone is safe. Roll-call PDF downloads the same record and opens the share sheet to send it on. Site Control accounts also see pending Smart Gate join requests on this screen; Advanced and Business accounts see attendance and evacuation without that Site Control-only section.

History, corrections and exports

  1. Scroll to Attendance history for every past check-in and check-out.

    On a phone, Jump to section at the top of the page takes you straight there. Use Load older history to page back through the record.

  2. Click Correct on a row to fix times.

    Add correction notes — the change is recorded with its reason.

  3. Export from the H&S attendance header.

    Export all covers every session. Choose a calendar month in the Month box first (it starts on the current month): Export monthly log, Download monthly H&S CSV / PDF, View audit log, Download full audit JSON and Export audit CSV (the audit trail of changes) cover that month. View audit log shows a page with a continuation cursor; Download full audit JSON and Export audit CSV retrieve the whole requested month. Records follow the order they were recorded, with the event time shown on each row. If records change during a download, later pages can include those changes; the download time does not freeze the month. Download again after work has settled when you need a consistent comparison.

Switching Site Access off or archiving a finished job

You can't switch Site Access off, or archive the project, while anyone is still signed in and not signed out there — the people on site would disappear from the live list and the evacuation roll-call. First check everyone out: in H&S attendance on the Access tab, click Check out on each row (someone who left without signing out stays listed until you do). Then untick Enabled under Project rollout at the top of the same tab, or archive the project. If someone is still signed in, you're told so and nothing changes.

Switching Site Access off stops new sign-ins on that project straight away, and its people stop counting toward the places included in your plan. Their identities, sign-in access, signatures and attendance history are all kept: the project's Access tab still shows Attendance history, and Export all, the monthly logs, the monthly H&S CSV and PDF and the audit log still download — after Site Access is switched off and after the project is archived. Reading this history never switches Site Access back on. Restoring an archived project whose Site Access was left on makes it a Site Access project again, so it is checked against your plan's limits like switching Site Access on.

If your plan has a fixed number of people who can sign in on site, switching Site Access on (or restoring a project) checks whether everyone on that project fits in the places you have free. If they all fit, they all get sign-in access. If they don't, nobody on that project is given a place automatically: a Choose who can sign in on site box opens under Project rollout on the Access tab. Tick the people you want and click Give sign-in access; everyone else can still sign documents and see site information. People who already have sign-in access on another Site Access project keep it. If no place is free, untick Can sign in on site for someone who no longer needs it first.

RAMS sign-off status lives here too

The Access tab's RAMS sign-off section (toggle: Required) shows per-worker Signed / Outstanding rows for each RAMS version — the site-access view of the same records as the document's Worker Sign-Off panel.

Frequently asked questions

How do workers check in?

From their side — through their portal link, or on Site Control through the site entrance QR. A sign-in records the check-in; it does not confirm someone is physically on site. You see everyone signed in and not yet signed out on the Access tab and can check anyone out manually.

How does a guest sign out at the site entrance?

At a Site Control entrance QR, sign out in the same browser tab used to sign in. Email or phone alone cannot authorise sign-out. If you cannot use that tab, ask the account owner or admin to open the project's Access tab, find your row in H&S attendance, and choose Check out. They can also close sign-ins recorded before this guest sign-out option was introduced.

Someone forgot to check out — can I fix the record?

Yes. The Access tab never closes a sign-in for you: the person stays in the H&S attendance list, with how long ago they signed in, until you click Check out on their row. To set the actual time they left, find the row in Attendance history, click Correct, set the right times, add a correction note and save. Corrections are recorded, not silent edits.

Does the H&S attendance count mean that many people are on site right now?

Not necessarily. On the project's Access tab the H&S attendance heading reads N signed in, not signed out. That counts people who signed in and have no sign-out recorded. Someone who left without signing out stays counted until a manager checks them out, so use the sign-in time and the note beside it on each row to spot sign-ins that look too old to be real.

What if the app loses connection just after I end an evacuation?

Once the app confirms the evacuation ended, it keeps that record in Recent evacuations even if the next refresh fails. Where several marshals are working at once, the app keeps the latest confirmed roll-call and orders Recent evacuations by when they started, rather than by which response arrives last. The roll-call PDF needs a connection to download. Failed refreshes show the last confirmed information with a warning; a confirmed loss of access hides the affected information instead. If you open the app, or switch back to it, more than about four hours after the last confirmed refresh, the evacuation screen shows Roll-call hidden instead of the stored copy until you reconnect and the next refresh succeeds — this protects people's details if access was revoked while the device was offline. A roll-call already on your screen is not cleared just because time passes, or when you briefly open a system panel such as Control Centre; that check happens only when you open the app or switch back to it. The stored copy is also dropped once the app can confirm the evacuation was started, ended, or corrected someone from safe back to unaccounted on another device while it was closed, so a reopened app never shows a roll-call state that another marshal has already superseded.

Why do an offline check-in and its received time differ?

On Advanced, Business or Site Control, open the project's Access tab and scroll to Attendance history; in the app, open the project, then More at the bottom of the screen → Access. The event time is labelled Phone-reported when it came from the phone, Server-recorded for a live server-timed event, or Manager-reported for a correction. The separate received time shows when the server accepted it. A queued offline tap can arrive later, and retrying the same accepted tap does not change either time. Older rows say Not recorded where that information was not retained; we do not invent it from the row's last edit time.

Does an empty evacuation roster prove the site is empty?

No. On the project's Access tab, or Site access → Evacuation in the app, the roster lists people recorded as signed in. An empty list means nobody was recorded as signed in; use your site's evacuation procedure to account for people who may not have checked in.

Where's the monthly H&S report?

On Advanced, Business or Site Control, open the project's Access tab. In the H&S attendance section header, Download monthly H&S CSV and Download monthly H&S PDF cover the calendar month chosen in the Month box beside them (it starts on the current month; pick an earlier month for a past report), alongside full exports and the audit log. Sessions without a recorded check-out counts records in that month's report, including older sessions; it is not a count of people currently on site. The Automatic RIDDOR indicator (review required) prompts a human check of reporting duties. An incident not flagged by the automatic check can still be reportable.

Can I be told when someone checks in or out?

Yes. On Advanced, Business or Site Control, an owner or admin opens the project's Access tab, finds Attendance notifications (off by default), ticks the events they want to hear about — Check-ins, Check-outs, Guest arrivals, Contractor arrivals or Missed checkouts — and clicks Save attendance notifications. Owners, admins and the project's Site Access managers then get an in-app notification each time. It covers every way someone can sign in: the contractor's own portal link in a browser, the contractor app, the site entrance QR (including remembered-device taps), and a manager's check-in from the dashboard. A gate tap only sends a notification when it creates or closes an attendance session; accepted retries and no-op taps do not send another one.

Related guides

Not using The Site Book yet? Start your first job free.

Start free →

Didn't answer it? Email [email protected] — we'll get back to you by email.