Skip to main content
Start your first project →

Export your audit trail with the Audit-Ready Pack

Pro and above

When an inspector, client or principal designer asks for your paperwork, you don't want to be assembling PDFs by hand. The Audit-Ready Pack brings the project's documents, version history, worker evidence, subcontractors and their documents, live Site Diary entries, attendance, sign-offs, evacuation roll-calls, inspections, corrective actions, plant history, incidents, COSHH and permits into a single PDF you can print or send.

Build the pack

  1. Open your project's audit pack (Pro access required).

    On the website, Principal Contractor and Only Contractor projects have Documents → Audit-Ready Pack → Create Pack →. For a subcontractor project, use the project ⋮ → Export audit pack, or More (in the bar at the bottom of the project) → Export audit pack on the phone website. In the mobile app, tap More at the bottom of the screen and choose Audit Pack under More.

  2. On the pack page, click Open full pack (PDF).

    The merged PDF opens in a new tab for printing or saving. If your browser blocks the pop-up, it downloads instead.

  3. Use Plant evidence appendix when you need the raw Plant files separately.

    The appendix contains a numbered manifest, supported images on labelled pages, and the raw PDFs in manifest order. Identical stored files are included once while every associated asset number and evidence title remains listed.

What the statuses in the pack say

In Documents in this pack, a document's Status reads Current only when nothing says it needs review. Otherwise it reads Review due followed by the same reason the project's Documents tab shows under its Review due badge, which names the trigger: a project detail the document prints was changed, the periodic review came round, or someone requested a review or changes. A document whose next review date has already passed reads Review due with The review date (…) has passed, even before the daily check marks it. When we correct our own standard RAMS or COSHH library wording, the Documents tab tells you, but the pack keeps showing that document as Current: the notice is for you, not for the people you give the pack to. The frozen PDF is still included. Review and regenerate it from the Documents tab, then build the pack again.

Site Induction Acknowledgements has a Language and a Wording shown column. When the exact site details and wording a worker was shown on the web portal, in the contractor mobile app or on a site QR page were saved, Language comes from that retained view and Wording shown points to a reference such as W1. The full pack PDF ends with an Appendix: Site Induction Wording that prints each distinct saved wording once, with the same language and how many acknowledgements point to it. Acknowledgements recorded before the wording was saved, and check-ins that sync later from a remembered phone without a saved wording record, read Original wording not retained; nothing in the appendix is rebuilt from the project's current details. If a saved record's signature can no longer be checked, its reference says (signature not verified) and the appendix entry carries a warning. The appendix prints up to 40 distinct versions within a fixed size. If a long-running project has more, the extra rows say Saved wording not printed in this pack (appendix size limit) and the pack states how many; that wording is still kept, and you can read it on the project's Access tab with View audit log or Export audit CSV for the month of the acknowledgement (Business and above).

Worker Certifications lists certificates under Workers in the sidebar for the project workers displayed in the pack. If the project has more than 500 workers, the pack shows the most recently added 500, states the full worker total, and marks certification coverage as limited to those displayed workers; the others are not assessed in that pack. A displayed worker who is not linked to a Workers directory record reads Not linked to the worker register — certificates cannot be shown with the status Unknown, and a linked worker with nothing recorded reads No certificate recorded in the worker register. The pack never fills the gap with other people's certificates. To fix an unlinked worker, open the project's Workers tab: a worker who is not linked has no Account badge and shows a + Account button on their row. Click + Account — it links that row to the worker in your Workers directory with the same name, or creates the record if there is none — then build the pack again. Adding the person again with + Add Worker does not link the existing row.

The Right to Work (record-keeping) section appears once a check is recorded for at least one displayed project worker. It covers up to the 500 most recently added project workers; if the roster is larger, both the section and the cover line say which displayed workers are assessed and that the others are outside the pack's limit. If no check is recorded among the displayed workers, the section is left out and the cover states that the displayed group has no recorded check while making clear that any workers omitted by the cap were not assessed. This does not establish that no check exists for an omitted worker. When shown, each displayed worker has the status of their latest recorded check — valid, expiring, expired or not allowed — not checked when no check is recorded for them, or unknown — not linked to the worker register (click + Account on their row on the project's Workers tab, as described above, to link them). If two project workers are linked to the same Workers directory record, both rows stay and the check is shown against the first. The cover line counts the same displayed workers as the table, and each stored check once. To add a check, open Workers, click the pencil Edit worker button and click Record a check under Right to work.

CSCS Cards shows Verified — CSCS Smart Check only when Smart Check returned valid and the card's recorded expiry date has not passed. If the date has passed the cell reads Card expired with the date, and the card is not counted in the cover's Smart Check verified figure even if its earlier Smart Check result was valid. The pack uses the recorded expiry date to assess whether the card is current; it keeps the earlier Smart Check result as history. A card with no expiry date shows Not recorded in the Expiry column. Review and re-verify cards on the project's Site Info page under Credentials and paperwork (Re-verify with CSCS Smart Check).

Fire Warden reads Recorded as fire warden when that box is ticked on the worker's record. There is no certificate or expiry date behind the tick, so the pack does not say Yes.

In the Incident & Near-Miss Log, the RIDDOR check (automatic) column reads Flagged by automatic check — RIDDOR may apply, with the reason, or Not flagged by automatic check. The flag is made from the incident's type, severity and a keyword scan of its description, so it is a prompt to check HSE guidance, not a decision: Not flagged does not mean an incident is not reportable. Reported to HSE reads Recorded as reported to HSE only after someone has clicked Mark as reported to HSE on the incident, and Not recorded as reported otherwise.

In Site Attendance, No check-out recorded means the session has no check-out time. Nothing closes a session automatically, so the person may still be on site or may have left without signing out; the pack does not say which. To correct a session, open the project's Access tab, find it in Attendance history and click Correct.

Evacuation / Muster Roll-Calls list the people who were signed in to the site system when the drill was triggered. Anyone on site who had not signed in is not on a roll-call, so a drill with an empty roster reads nobody was signed in at trigger rather than saying nobody was on site, and a drill with no end time reads no stand-down recorded. The roll-call PDF you download from the Access tab says the same about who is listed.

Subcontractors in the pack

The Subcontractors section follows Worker Certifications. It lists every subcontractor linked to the project on the project's Subcontractors tab, in the order they were added, and says so plainly when none are linked. For each one it prints the details held for them — contact name, email and phone, trades, Role on this project, Scope on this project, general scope of work, supervision contact, Project RAMS reference, CPP contribution, competence, previous work references and notes — leaving out anything that is blank. Role on this project reads Contractor for a firm managing its own work, which is how every firm starts when it is put on a project on the website or in the app, and Worker for one you set to Working under your direction (on the website, from the firm's Details on the project's Subcontractors page). First aider and Fire warden read Recorded as providing a first aider or Recorded as providing a fire warden when that box is ticked; there is no certificate behind the tick, so the pack does not say Yes.

Under Documents on file, Insurance, RAMS and Public liability insurance each read Not on file, or On file with what the expiry date supports: In date, Expires in a number of days, Expired or Expiry not recorded. The Health & safety policy has no expiry and shows its upload date. To add or replace a document, open Subcontractors in the sidebar, click the pencil Edit subcontractor button on their row, upload the file and set its expiry date (Pro and above), then build the pack again. The cover's Subcontractors line counts how many have insurance, RAMS or public liability missing or expired.

On Business and above, the section also lists the Project evidence you requested or received for each subcontractor on the project's Subcontractors tab, with its review status and expiry, and the project's Compliance requirements for them with their stage, status, due date and the accepted revision's file names. Archived evidence, draft requirements and cancelled requirements are left out.

The full PDF adds a Subcontractor documents appendix after the inspection photos and before any Plant evidence. It opens with a list of every file and whether it is shown in the appendix, included as a PDF after it, or not included and why. Photos of documents are printed on the appendix pages; PDFs follow it. Rejected or requested evidence without a file is listed in the section but not added as a file. Up to 60 photos and 30 PDFs are attempted within the pack's size and build-time limits; anything left out is named on the cover's Missing from this pack notice and stays available on the project's Subcontractors tab. Files submitted against compliance requirements are named but not added; they stay with the requirement under the Requirements tab of the project's Subcontractors page.

The sign-off audit trail

The pack's Worker Document Sign-Offs section shows up to the 500 most recently created RAMS, Emergency Plan and Site Induction sign-off records. That set includes outstanding assignments as well as signed and superseded evidence, and is then grouped by document and version for display. Each row shows its status, the applicable revision and, when signed, the signing time and identity evidence. Signed rows can come through either the shared crew link or the authenticated mobile app. If there are more than 500 records, the pack states the total and that it is showing the most recent 500. Toolbox Talk Acknowledgements are listed in their own section, also up to the 500 most recent with the total disclosed when truncated. On Business and above, a signed shared-link row made with a worker PIN says PIN verified; an authenticated mobile-app row says Signed in as themselves; a dash means neither check applied. Each signed version-aware row records what the worker attested to without pretending a PIN is biometric proof.

Long-running project records

To keep the pack reliable on long-running projects, Project Workers, incidents, Permits to Work, Client Permits, COSHH substances and captured CSCS cards are each limited to the 500 most recent records. The legacy sign-link section is limited to the 500 most recent requests and the 500 most recent signatures across those requests. Each displayed request gives its full signature count. Screen and PDF show the full total and the number included whenever a limit leaves records out; older records remain in their project section in The Site Book.

The Site Diary section

Up to the most recent 500 live Site Diary entries are listed with their date, weather, workers on site, work completed, issues or delays, and attached-photo count. Deleted entries are kept out of this compliance pack. If a Site Supervisor (a Business-and-above role) deleted an entry, an owner or admin can restore it before rebuilding the pack; an owner/admin deletion is permanent. On projects with more than 500 live entries, the section heading states the limit.

Inspections, actions and plant history

The Site Inspections & Corrective Actions section gives exact inspection totals and names every active status: complete, open and draft. Failed-check figures are shown separately because a failed item can belong to an inspection in any of those statuses. Up to the 500 most recent non-archived inspections containing a failed or safety-critical check are loaded with their location, overall and item notes, completion context, plant link and captured-photo count. If more exist, the pack states the exact exception total and the number displayed. A failed check is never described as having created an action unless an action actually exists.

Corrective actions remain visible even if their original inspection has since been archived. Each displayed action retains its description, assignee, due date, completion time, close-out notes and photo count. Captured exception/action photos are fetched and verified, downscaled for reliable printing, then embedded in the printable page and a private-URL-free appendix in the full PDF. Up to 60 distinct images are attempted within a cumulative pack-size and build-time limit; any count truncation, resource-limit omission or unavailable image is stated in the pack while the original evidence remains recorded. On projects with more than 500 actions, the pack states the exact total and shows 500 prioritised records: safety-critical first, then active work. The cover's action total and open/safety-critical figures come from the full project record, not that displayed subset.

The Plant & Equipment section contains placements that physically reached the site — on site, quarantined or removed — and keeps removed periods as history. Each placement shows the asset identity, ownership and supplier snapshot, arrival/removal dates, site location, RAMS reference and final project status. It evaluates the mandatory evidence requirements that applied during that period, so a certificate that expired after removal does not make earlier use look invalid, while a later renewal cannot hide an evidence gap that occurred on site. Evidence that was recorded but never valid during the placement is identified separately from a missing record. Exact gap dates are shown only where they can be proved; unstated validity, unrecorded legacy requirement history or evidence omitted at the 500-record load limit is never turned into a guessed gap. The section also gives exact inspection, failed-inspection and corrective-action counts, details failed or safety-critical checks and open actions, and records quarantine and return-to-service periods and notes. Planned, awaiting-review, approved-but-not-arrived, archive-removed-but-never-arrived, rejected and cancelled placements are not presented as site use. The cover counts distinct plant items and adds Plant inspection, failed checklist-item, event-backed open-defect, evidence-gap and quarantine-event totals; the section counts placement periods. If there are more than 250 periods, it states the total and shows the 250 most recent rather than using today's register values. For approved or historically superseded evidence whose validity could support a recorded placement period, the full PDF appends safe, retrievable raw files after a private-URL-free manifest. Supported images become labelled appendix pages; raw PDFs follow in numbered order. Identical stored files are deduplicated without losing any asset/title label. Missing, unsupported, unsafe or unavailable files are named. If the complete set exceeds the main pack's count, byte or build-time budget, the cover says no raw Plant files were appended there and directs you to the separate Plant evidence appendix download, which has a larger bounded envelope and its own truthful omission notice. Raw private storage URLs are never printed or linked.

Frequently asked questions

Where is the audit pack in the mobile app?

Open your project, tap More at the bottom of the screen, then Audit Pack under More. Tap Generate audit pack to build the full PDF; each pack you generate is kept in the screen's pack history. Generating a pack does not create a share link or change the project's records.

Does a pack generated in the mobile app include permit documents and photos?

Yes. In the mobile app, tap More at the bottom of the screen, then Audit Pack → Generate audit pack: that builds the full PDF and saves it in the app's pack history. The generated PDF carries the same appendices as the website download: the Client Permits appendix, with permit photos printed on its pages and permit PDFs added straight after it, the inspection and corrective-action photo appendix, and the Subcontractor documents appendix. Anything that could not be included is named on the cover's Missing from this pack notice.

How does the pack show offline attendance and sign-off times?

On Pro and above, open the project's Documents tab and build the Audit-Ready Pack. Its attendance, worker document sign-off and toolbox acknowledgement rows show the event time, its source and the server's received time when recorded. Phone-reported means the phone supplied the capture time, so the server may have received an offline action later. Server-recorded identifies a server-timed event; Manager-reported identifies a correction. Older evidence shows Not recorded for missing provenance or receipt time. Regenerating the pack does not fill those historical gaps or change the original event times.

What's in the Audit-Ready Pack?

A cover summary; project documents and version history; worker certification, right-to-work and CSCS status; every subcontractor linked to the project with their details, documents, evidence and compliance requirements, plus their RAMS, insurance, public liability and H&S policy files; Site Diary entries and photo counts; attendance; worker document sign-offs; evacuation roll-calls; inspections and corrective actions; plant that reached the site, including removed history; incidents; COSHH; and permits. Deleted Site Diary entries are excluded. Project Workers, incidents, Permits to Work, Client Permits, COSHH substances and captured CSCS cards show up to the 500 most recent records. Legacy sign-link records show up to 500 requests and 500 signatures across those requests; each listed request still shows its full signature count. When a section reaches a limit, the pack states the full total and how many records are shown. The client-permit appendix includes captured documents for the listed permits; older permit records and their captures stay on the project's Client Permits page.

How does the pack show a worker's first-aid cover?

The First Aid column in the pack's Project Workers section states what the project's worker record shows: "Yes, valid to" with the certificate's expiry date, "Recorded as first aider — expiry not recorded" when the worker is marked as a first aider but no expiry date is recorded (it does not say Yes, because nothing shows a certificate is current), or "Expired" with the date. It never prints a bare Yes. To record or correct a date, open the project's Workers tab, click the worker, tick First aider, set First-aid certificate expires and click Save, then build the pack again. The Worker Certifications section is separate: it lists the certificates held in your account's Workers directory for the workers on this project, so a worker can appear there with their own expiry date as well.

What do the worker, CSCS, incident, attendance and roll-call statuses in the pack mean?

Each cell says what is on record and what it rests on. A missing date, an unrecorded check or a worker the project cannot link to your Workers directory is said to be missing or unknown — nothing is shown as a plain Yes or No from a tick, a blank or a keyword alone. What the statuses in the pack say, below, gives the wording for every column and where to change the record behind it.

Does the pack include my subcontractors' RAMS and insurance?

Yes. The pack's Subcontractors section lists every subcontractor linked to the project: contact details, trades, their role and scope on this project, supervision contact, project RAMS reference, CPP contribution, first aider and fire warden, competence notes and notes. For each one it shows whether Insurance, RAMS, Public liability insurance and the Health & safety policy are on file, with the expiry date and whether it is in date. The full PDF then adds a Subcontractor documents appendix with those files themselves. A subcontractor only appears once they are linked on the project's Subcontractors tab; their documents are uploaded under Subcontractors in the sidebar. See Subcontractors in the pack, below.

Which plans include the Audit-Ready Pack?

Pro and above, on both the website and signed-in mobile app. The Documents-page card appears on Principal Contractor and Only Contractor projects; subcontractor projects can use the project's Export audit pack action instead. Projects bought through our setup service keep access. In the mobile app, when the server confirms your account has no access, Audit Pack shows a Pro feature explanation with Open upgrade page and Try again. You can also upgrade through the menu (☰), then Settings → Account & plan → Manage on web. Returning to the app refreshes access; Try again immediately reloads this project’s pack history. Other loading failures show an error with a retry control.

The pack says some documents are missing — what does that mean?

If a project document or approved Plant evidence file couldn't be retrieved, the pack names it rather than silently shipping incomplete. Restore or re-upload the named evidence, or regenerate the named project document, then build the pack again.

Why is there a separate Plant Evidence Appendix download?

The main pack appends the complete deduplicated set of relevant approved Plant PDFs and images when it fits its safe build limit. The separate appendix is always available when relevant raw Plant evidence exists, and has a larger safety limit for evidence-heavy projects. If the main pack cannot safely append the complete set, its cover says so and keeps the historical Plant summary intact.

Related guides

Not using The Site Book yet? Start your first job free.

Start free →

Didn't answer it? Email [email protected] — we'll get back to you by email.